E
Elevaite
Powered by Edessa
Back to Elevaite
Operations

Phase 2 Weekly Build Cadence

Weekly development workflow for Phase 2 builds using default tech stack (Next.js + Supabase + Claude) with Cloud Code and bypass permissions. Use when entering weekly build rhythm after PRD is locked. Includes commit-per-step discipline, QA loop pattern, and Phase 1/2/3 feature splits for vertical slice delivery.

240 min estimatedRun weekly